The Town has received a proposed Official Plan Amendment and Zoning By-law Amendment application for a quarry.
The quarry is a Class A, below-water table quarry, meaning that the proposal is to remove more than 20,000 tonnes of bedrock aggregate annually, from below the water table. Based on the application received, the proposed tonnage limit for the proposed CBM Caledon Pit / Quarry is 2.5 million tonnes per year and on average CBM anticipates shipping approximately 2.0 million tonnes per year once operations are in full production. The application also indicates removal of the rock in the quarry will include blasting using controlled explosives.
- Town File Number(s): POPA 2022-0006 and RZ 2022-0010
- Applicant: Glen Schnarr and Associates on behalf of CBM - Caledon
- Current Status
- The Planning Act applications (proposed Official Plan and Zoning By-law Amendments) are in circulation and under review by the Town.
- An update report will be presented at a Public Meeting on January 29, 2026 at 7 p.m. at the Alton Legion, 1267 Queen St. W., Alton ON L7K 0C7.
- The applicant’s related Aggregate Resource Act Licence application is under review by the Ministry of Natural Resources and Forestry. More information is provided at the bottom of this page.
Subject Lands
The subject lands include multiple properties including 18667 Mississauga Road, 18722 Main Street, 0 Main Street, 18501 Mississauga Road, 1055 Charleston Sideroad, 18221 Mississauga Road, 0 Charleston Sideroad,1455 Charleston Sideroad, and 1420 Charleston Sideroad, Ward 1.
- Location - Multiple Addresses, Ward 1

Notices, Reports and Frequently Asked Questions (FAQ's)
- Notices
- Notice of Application - March 23, 2023
- Update Letter to Residents and Community Groups - April 14, 2023
- Update Memo - May 17, 2023
- Frequently Asked Questions (FAQs)
- Notice of Public Meeting #1 - May 25, 2023
- Notice of Public Meeting #2 - January 8, 2026
Planning Act Application Materials and Information
- Official Plan Amendment
The Official Plan Amendment application proposes to redesignate the lands in the Town Official Plan from General Agricultural Area, Rural Lands and Environmental Policy Area to:
- Extractive Industrial B to permit above and below water table aggregate resource extraction; and,
- Environmental Policy Area to protect the existing tributary (watercourse) in the north-west corner of the site.
- Zoning By-law Amendment
The Zoning By-law Amendment application proposes to rezone the lands from Agricultural (A1) and Environmental Policy Area 2 Zone (EPA2) to Extractive Industrial – Exception XX (MX-XX) and Environmental Policy Area 1 Zone – Exception 487 (EPA1–487). The Extractive Industrial zone would permit the quarry and extraction, while the EPA1–487 zone allows the area to be licensed but no extraction permitted. The EPA1-487 zone aligns with the proposed Environmental Policy Area to protect the existing tributary in the north-west corner of the site.
- 2nd Submission
- A001 - Existing Features
- A002 - Operational Plan
- A003 - Rehabilitation Plan
- A004 - Technical Recommendations
- Agricultural Impact Assessment (Revision)
- Air Quality Impact Assessment (Revision)
- ARA Re-Submission Cover Letter
- Blast Impact Assessment (Revision)
- Cover Letter
- Cover Letter (Supplemental Material)
- Cultural Heritage Recommendations Letter
- Cultural Heritage Report (Revision)
- Heritage Impact Assessment 1055 Charleston Sideroad
- Heritage Impact Assessment 1420 Charleston Sideroad
- Heritage Impact Assessment 18501 Mississauga Road
- Heritage Impact Assessment 18667 Mississauga Road
- Heritage Impact Assessment 18722 Mississauga Road
- Maximum Predicted Water Table Report (Revision)
- Natural Environment Report (Revision)
- Noise Assessment Report (Revision)
- Peer Review Air Quality
- Peer Review Blast Impact Assessment
- Peer Review Natural Science
- Peer Review Noise Assessment
- Peer Review Traffic Impact Assessment
- Peer Review Water Resources
- Planning Justification & ARA Summary (Revision)
- Rehabilitated Landform and Ecological Enhancement Areas
- Socio Economic Assessment Report (Revision)
- Stage 1-2 Archaeological Assessment Entered Into Register
- Transportation Impact Study (Revision)
- Visual Impact Assessment (Revision)
- Water Report Level 1-2 Caledon (Revision)
- Material Submitted
- A105 - Maintenance Shop Elevation
- A001 - Existing Features
- A002 - Operational Plan
- A003 - Rehabilitation Plan
- Agricultural Impact Assessment
- Air Quality Impact Assessment
- Blast Impact Assessment
- CBM Caledon Easement Report
- Cover Letter
- Cultural Heritage Report
- Water Table Report
- Natural Environment Report
- Noise Assessment Report
- OPA and ZBA Application Form
- Phase 1 ESA
- Planning Justification ARA Summary Statement
- DART Application Checklist
- Site 1 - Phase 1 ESA
- Site 2 - Phase 1 ESA
- Site 3 - Phase 1 ESA
- Site 4 - Phase 1 ESA
- Site 5 - Phase 1 ESA
- Site 6 - Phase 1 ESA
- Site 7 - Phase 1 ESA
- Site 8 - Phase 1 ESA
- Site 9 - Phase 1 ESA
- Site 10 - Phase 1 ESA
- Site 11 - Phase 1 ESA
- Site 12 - Phase 1 ESA
- Site Descriptions
- Socio Economic Assessment Report
- Stage 1-2 Archaeological Assessment
- Summary
- Surveys Table Summary
- Transportation Impact Study
- Visual Impact Assessment
- Hydrogeological Assessment - Please refer to Water Resource Study Parts A, B and C
- Zoning By-law Matrix
- Peer Review Comments and 3rd Submissions
- Additional Hydrostratigraphic Cross Sections (2024)
- Agriculture - CAART Comment Table
- Agriculture - CAART Comments Attachment
- Agriculture - Peer Review Comments
- Agriculture - Response to Peer Review
- Air Quality - CAART Comment Table
- Air Quality - Peer Review Comments
- Air Quality - Response to Peer Review
- Best Management Practices Plan - Dust (March 2025)
- Best Management Practices Plan - Dust (May 2025)
- Blasting - CAART Comment Table
- Blasting - Peer Review Comments
- Blasting - Response to Peer Review
- Caledon Pit and Quarry - Site Plan (Redlined March 2025)
- Caledon Pit and Quarry - Site Plan (Redlined May 2025)
- Geomorphology Assessment (February 2025)
- Groundwater Mitigation System Design Report (May 2025)
- Heritage Comments (March 2025)
- Hydrogeology - CAART Comment Table
- Hydrogeology - Peer Review Comments
- Hydrogeology - Response to Peer Review
- Hydrogeology (Karst) - Peer Review Comments
- Hydrogeology (Karst) 1 of 2 - Response to Peer Review
- Hydrogeology (Karst) 2 of 2 - Response to Peer Review
- Natural Heritage - CAART Comment Table
- Natural Heritage - Peer Review Comments – Fish Habitat, Blasting, Dewatering
- Natural Heritage - Peer Review Comments
- Noise - CAART Comment Table
- Noise - Peer Review Comments
- Planning Justification Report (Addendum May 2025)
- Stage 3 Archaeological Assessment - Cover Letter
- Stage 3 Cameron Site (August 2024)
- Stage 3 Location 1 (August 2024)
- Stage 3 Location 2 (August 2024)
- Stage 3 Location 4 (August 2024)
- Stage 3 Location 7 (August 2024)
- Stage 3 Location 9 (August 2024)
- Stage 3 Location 10 (August 2024)
- Stage 3 Location 12 (August 2024)
- Stage 3 Location 15 (August 2024)
- Stage 3 Location 16 (August 2024)
- Stage 3 Location 18 (August 2024)
- Stage 3 Location 22 (August 2024)
- Stage 3 Location 26 (August 2024)
- Stage 3 Location 27 (August 2024)
- Transportation - CAART Comment Table
- Transportation - Peer Review Comments
- Transportation - Response to Peer Review
- Transportation Impact Study and Haul Route Assessment (Revised March 2025)
- Water Report Addendum (March 2025)
- Additional Peer Review Comments and 3rd Submissions – October 2025
- Natural Heritage - Response to Peer Review
- Natural Heritage - Response to Peer Review Figures & Appendices
- Natural Heritage - Additional Wetland Assessment Woodland B
- Natural Heritage - Natural Feature Impact Summary Table
- Natural Heritage - Species at Risk Bat Habitat Assessment
- Socio-Economic - CAART Comment Table
- Socio-Economic - Peer Review Comments
- Visual – CAART Comment Table
- Visual – Peer Review Comments
- Additional Peer Review Comments and 3rd Submissions – December 2025
- Agricultural Impact Assessment - SAI Response (Dec 1 2025)
- Agriculture - Peer Review Comments Update (December 2025)
- Air Quality - CAART Comments Responses (November 2025)
- CBM Caledon Pit and Quarry - Site Plan - Redlined (July 2025)
- Cultural Heritage - Peer Review Comments Update (December 2025)
- CVC and Region of Peel Comments_CBM Quarry_ First Submission
- Hydrogeology - CAART Comments Table Update (December 2025)
- Hydrogeology - Peer Review - Finalized (December 2025)
- Karst - CAART Comment Tables Final 1 of 2 (November 2025)
- Karst - CAART Comments Table Final 2 of 2 (November 2025)
- Karst - Updated Comment Table (Oct 17 2025)
- Natural Environment Technical Report - Appendix - CAART Comment Table (Oct 2 2025)
- Natural Environment Technical Report - Attachments - Natural Features Table (Oct 2025)
- Natural Environment Technical Report - Attachments - Additional Wetland Assessment (Oct 2025)
- Natural Environment Technical Report - Attachments - SAR - Attachments (Oct 2025)
- Natural Environment Technical Report - CAART Comment Table (Oct 2025)
- Socio-Economic - Peer Review Response - Final (Oct 17 2025)
- Transportation - CAART Comments Table Update (December 2025)
- Transportation - Peer Review Comments Update (December 2025)
- Transportation - Traffic Memo (October 2025)
- Visual Impact Assessment - CAART Table - WSP Finalized (Oct 30 2025)
- Visual Impact Assessment - WSP Addendum (Oct 30 2025)
- Stage 3 Archeological Assessments - MCM Acceptance Letters
- Stage 3_Cameron Site_MCM for P364-0200-2022 (Jun 19 2025)
- Stage 3_Location 1_MCM for P364-0200-2022 (Jul 29 2025)
- Stage 3_Location 2_MCM for P364-0202-2022 (Jul 24 2025)
- Stage 3_Location 4_MCM for P364-0203-2022 (May 14 2025)
- Stage 3_Location 7_MCM for P364-0204-2022 (Jul 28 2025)
- Stage 3_Location 9_MCM for P364-0199-2022 (May 27 2025)
- Stage 3_Location 10_MCM for P364-0197-2022 (Oct 24 2024)
- Stage 3_Location 12_MCM for P364-0196-2022 (Aug 25 2025)
- Stage 3_Location 15_MCM for P364-0208-2022 (Jun 16 2025)
- Stage 3_Location 16_MCM for P364-0207-2022 (May 1 2025)
- Stage 3_Location 18_MCM for P364-0209-2022 (May 7 2025)
- Stage 3_Location 22_MCM for P364-0206-2022 (Oct 24 2024)
- Stage 3_Location 26_MCM for P364-0198-2022 (Oct 24 2024)
- Stage 3_Location 27_MCM for P364-0195-2022 (Aug 5 2025)
- Stage 3 Archaeological Assessment - Cameron Site - May 2025
- Stage 3 Archaeological Assessment - Location 1 - June 2025
- Stage 3 Archaeological Assessment - Location 2 - June 2025
- Stage 3 Archaeological Assessment - Location 4 - April 2025
- Stage 3 Archaeological Assessment - Location 7 - June 2025
- Stage 3 Archaeological Assessment - Location 9 - April 2025
- Stage 3 Archaeological Assessment - Location 12 - June 2025
- Stage 3 Archaeological Assessment - Location 15 - May 2025
- Stage 3 Archaeological Assessment - Location 16 - March 2025
- Stage 3 Archaeological Assessment - Location 18 - March 2025
- Stage 3 Archaeological Assessment - Location 27 - June 2025
- Response Records Received
- Additional Peer Review Comments and Submissions - April 2026
- AIA - February 26 2026 Caledon CAART Comment Table-RESPONSE
- AIA - Soil & CLI Info for Main, North, and South Areas
- Air Quality - Feb 2026 CBM_Caledon CAART Comment Table (SLR) 2nd Round Responses
- Air Quality - Rev1-CBM Caledon-AQMP -Feb2026 revised
- Air Quality - Rev1-VCNA Caledon Dust BMPP-27Feb2026 Revised
- Blasting - Peer Review - CBM Caledon Quarry - Englobe
- Blasting - Peer Review Comments-2nd Set_CBM Caledon Quarry_2Apr2026
- Comment_Response Matrix_2026 CBM_CVC_Feb2026
- Cultural Heritage - OCUL2216_R_Rev0_18722MainSt_HIA_FINAL_26Feb2026
- Cultural Heritage - CBM Caledon Quarry CHR_AddendumMemo_FINAL_2026-03-19
- Cultural Heritage - Cover Letter Resubmission CBM Heritage Materials March 2026
- Cultural Heritage - OCUL2216_R_Rev0_1055CharlestonSideroad_HIA_26Feb2026
- Cultural Heritage - OCUL2216_R_Rev0_1420CharlestonSideroad_HIA_FINAL_26Feb2026
- Cultural Heritage - OCUL2216_R_Rev0_18501MississaugaRoad_HIA_FINAL_26Feb2026
- Cultural Heritage - OCUL2216_R_Rev0_18667MississaugaRoad_HIA_26Feb2026
- Cultural Heritage - POPA 22-06_Heritage comments_updated CHR HIAs 24-Mar-2026
- Noise - Peer Review Response_CBM Caledon_WSP Mar2026
- Noise - Peer Review Response_CBM Caledon_WSP Mar2026_attachments
- Socio-Economic - (2026 02 25) Caledon Quarry Peer Review Phase 2 Memo - Released
- Socio-Economic WSP - CBM Caledon Addendum_21Apr2026
- Stage 3 Archaeological Assessment - Cameron Site - May 2025
- Stage 3 Archaeological Assessment - Location 1 - June 2025
- Stage 3 Archaeological Assessment - Location 2 - June 2025
- Stage 3 Archaeological Assessment - Location 4 - April 2025
- Stage 3 Archaeological Assessment - Location 7 - June 2025
- Stage 3 Archaeological Assessment - Location 9 - April 2025
- Stage 3 Archaeological Assessment - Location 12 - June 2025
- Stage 3 Archaeological Assessment - Location 15 - May 2025
- Stage 3 Archaeological Assessment - Location 16 - March 2025
- Stage 3 Archaeological Assessment - Location 18 - March 2025
- Stage 3 Archaeological Assessment - Location 27 - June 2025
- TIS - 2026-04-17 CBM_Echelon RESPONSE to CAART PR Round 2
- TIS - CAART Table Response Attachment_Apr 16 2026
- TIS - December 2025 Peel Comments-Traffic
- TIS - MTO Comments April 2026-CBM Caledon Application
- TIS - POPA 22-06 Transportation Staff comments
- Visual - CBM Caledon VIA Addendum-WPD-COMMENTS
- Visual - WPD-Comments-Caledon-CAART-2026-03-Mar23-VIA
- Additional Peer Review Comments and Submissions - June 2026
- AIA - SAI Letter to Caledon - CBM -May 28-2026
- Air Quality - May 2026 CBM_Caledon CAART Comment Table SLR) 3rd Comment Set - Copy
- Air Quality - May 2026 CBM_Caledon CAART Comment Table SLR) 3rd Comment Set
- Blasting - Addendum to Blast Impact Assessment Report Rev0 20260527
- Blasting - Peer Review Comments-2nd Set_CBM Caledon Quarry
- CBM - Caledon Future Caledon Planning Overview_Final May 1 2026
- CBM - Caledon Pit Quarry ARA Redlined Site Plans May 2026
- CBM Caledon Pit Quarry - Response to Outstanding Comments dated May 30, 2025
- Cultural Heritage - Heritage Conservation_Rev0_1420 Charleston Sideroad HCP-19May2026
- Cultural Heritage - Heritage Conservation_Rev0_18501 Mississauga Road HCP_19May2026
- Cultural Heritage - Heritage Conservation_Rev0_18667 Mississauga Road HCP_19May2026
- Cultural Heritage - Heritage Conservation_Rev0_18722 Main Street HCP_19May2026
- Cultural Heritage - Heritage Documentation_Rev0_1055CharlestonSideroad_CHDR_27May2026
- Cultural Heritage - Heritage Documentation_Rev0_18501MississaugaRoad_CHDR_27May2026
- Cultural Heritage - Heritage Documentation_Rev0_18667MississaugaRoad_CHDR_27May2026
- Hydrogeology - CAART COMMENT TABLE #1 Peer Review Response_CBM Caledon_29May2026
- Hydrogeology - CAART COMMENT TABLE #2 Hydrogeology Peer Review Response_CBM Caledon_29May2026
- Hydrogeology - CBM_Caledon_Monitoring_Triggers_Rev0-29May2026
- May 2026 CBM Responses to Public Comments Chart
- MHBC - MNR Letter Updated Site Plans_Agency Correspondence May 5 2026
- Natural Heritage - Peer Review Response Pkg - CBM Caledon Quarry_1May2026pdf
- Noise - Peer Review Response_CBM Caledon_WSP_VCL Jun2026
- TIS - 2026-05-28 CBM_Echelon RESPONSE to CAART PR Round 2 _ HDR final responses
- TIS - CBM Caledon - Region's Review and 2nd email re Sign off 10 June 2026
- TIS - CBM Caledon - Region's Sign off (Tunnels) 10 June 2026
- Visual - CBM Caledon CAART Table - Wavefront Response 2026-06-June04
- Visual - CBM Caledon CAART Table - WSP_CBM Round 2 Responses May 28 2026-Final
- Visual - Fig 1 to CAART Response_May 2026_Planting Areas
- Visual - Fig 1 to CAART Response_May 2026_Planting Areas
- Additional Peer Review Comments and Submissions - September 2026
- Agriculture - Colville Response to Town - August 10 2026
- Agriculture - SAI Letter to Caledon - CBM - 09 15 2026
- Air Quality - CBM_Caledon CAART Comment Table (SLR) 4th Comment Set_24July2026
- Air Quality - CBM_Caledon CAART Comment Table Applicant 4th Comment_ResponseSept2026
- Air Quality - CBM_Caledon CAART Comment Table Applicant Response (3rd Set)_10July2026
- Air Quality - Rev2.1-VCNA Caledon Dust BMPP-1Sept2026
- Air Quality - Rev2-VCNA Caledon Dust BMPP-10July2026
- Air Quality - Sept 2026 CBM_Caledon CAART Comment Table (SLR) 5th Comment Set_260918
- Blasting - Caledon Pit and Quarry - Location of Initial Blast July 2026
- Blasting - Peer Review Comments-CBM Caledon Quarry_Final CAART Comment Chart
- Blasting - Peer Review Comments-CBM Caledon Quarry_WSP Response 3rd Round July 10 2026
- Cultural Heritage - CBM Heritage Confirmation_2026-08-18
- Noise - Attachment A - Site Plans Revision
- Noise - Attachment B - Revised Table 9
- Noise - CAART Noise Peer Review Response_CBM Caledon July 29 2026 (3rd Set)
- Noise - CAART Noise Peer Review_CBM Caledon August 19 2026 (4th Set)
- Visual - CBM Caledon CAART Table - VIA - Wavefront Response 2026-June-04_CBM WSP Response July 9
- Visual - CBM-Final-Acceptance
- Visual - Planting_Groupings
Lead Planner for the Town
Genevieve Scott
Cuesta Planning Consultants Inc.
genevieve@cuestaplanning.com 519-372-9790
For more information about this matter, or to provide comments, feedback or ask questions, please contact cbmapplication@caledon.ca
Related Aggregate Resources Act Licence Application
On April 6, 2023, the Town was informed that the applicant had submitted the required Aggregate Resources Act (ARA) Licence application for the proposed quarry to the Ministry of Natural Resources and Forestry (MNRF Class A Licence #626600).
- Notice of ARA Licence Commenting Period and Public Information Session - September 21, 2023
- A Notice of Objection was sent to the MNRF and the applicants on November 17, 2023 in relation to the ARA Licence.
- A further Notice of Objection was sent to the MNRF on June 23, 2025.
Public comments on the proposed Class A Licence #626600 should be sent to both the province and the applicant as follows:
Integrated Aggregate Operations Section
Ministry of Natural Resources and Forestry
300 Water Street
Peterborough, ON K9J 3C7
ARAapprovals@ontario.ca
Jennifer Deleemans and Andreanne Simard
CBM
55 Industrial Street
Toronto, ON M4G 3W9
jennifer.deleemans@vcimentos.com and andreanne.simard@vcimentos.com
Karen Bennett
Glen Schnarr and Associates Inc.
700 - 10 Kingsbridge Garden Circle
Mississauga, ON L5R 3K6
karenb@gsai.ca