Dial 311

For Town services & local information


Get in Touch

Phone905-584-2272 Toll Free1-888-225-3366 Emailinfo@caledon.ca
Address6311 Old Church Road, Caledon, Ontario

Text Size


Colour Contrast

We are working to make our website and services easier for everyone to use. Adjust the settings above to improve readability and contrast.

Caledon Rail to Trail (CRT) Project

The Town of Caledon has been given the opportunity to convert a 36 km stretch of the former Orangeville Brampton railway corridor, that runs through our town, into a multi-use trail. This section of the proposed trail runs from Orangeville to Mississauga, with the total length of the corridor being 51 km.

Visit HaveYourSayCaledon.ca/CRT for engagement opportunities as they become available. 

The CRT Project will: 

  • Connect the communities in Caledon as well as Orangeville, Brampton and Mississauga;
  • Promote walking and cycling for recreation and the enjoyment of nature;
  • Support healthy living, economic development and tourism opportunities; and
  • Help build a healthier Town.

The CRT Project includes 3 major phases:

  • Phase 1: Initial consultation, defining the scope, safety review of the corridor under interim conditions, public consultation to inform preliminary design
  • Phase 2: Preliminary design, public consultation on preliminary design, completion of relevant studies
  • Phase 3: Detailed design, construction

Background:

On July 15, 2022, the Municipalities of Caledon, Brampton and Mississauga purchased 51km of the railway corridor which runs from the Caledon-Orangeville boundary to just north of Streetsville. This railway will be converted into a trail – linking the municipalities and unifying the Trans Canada Trail system.

Questions? 

Please reach out to Engineering Services: engineeringservices@caledon.ca | 905-584-2272.